ITEM 506 – STONE MASONRY
506.1 Description
    
This Item shall consist of stone masonry in minor structures, in headwalls
    for culverts, in retaining walls at the toes of slopes, and at other places
    called for on the Plans, constructed on the prepared foundation bed, in
    accordance with this Specification and in conformity with the lines,
    grades, sections, and dimensions shown on the Plans or as ordered in
    writing by the Engineer.
506.2 Material Requirements
506.2.1 Stone
The stone shall be clean, hard, and durable and shall be subject to the
    Engineer’s approval. Adobe stone shall not be used unless otherwise
    specified.
Sizes and Shapes – Unless other sizes are shown on the Plans, stones have a
    thickness of not less than 150 mm, and widths of not less than one and
    one-half times their respective thickness, and lengths of not less than one
    and one half times their respective widths. Each stone shall be of good
    shape and be free of depressions and projections that might weaken or
    prevent it from being properly bedded.
Dressing – The stone shall be dressed to remove any thin or weak portions.
    Face stones shall be dressed to provide bed and joint lines that do not
    vary more than 20 mm from the true lines and to ensure the meeting of bed
    and joint lines without the rounding of corners of the stones in excess of
    30 mm in radius. Bed surfaces of the face stones shall be approximately
    normal to the face of the stones for about 80 mm and from this point may
    depart from a normal plane not to exceed 50 mm in 300 mm.
Finish for Exposed Faces – Face stones shall be pitched to the line along
    the beds and joints. The maximum projection of rock faces beyond the pitch
    lines shall not be more than 50 mm.
506.2.2 Mortar
Cement, fine aggregate, and water shall conform to the respective
    requirements for those materials as specified under Item 405, Structural
    Concrete, except as to the grading of fine aggregate which shall all pass
    the 2.36 mm (No. 8) sieve, not less than15 nor more than 40 percent shall
    pass the 0.3 mm (No. 50) sieve, and not more than10 percent shall pass the
    0.15 mm (No.100) sieve.
The mortar for the masonry shall be composed of one part of Portland Cement
    and two parts of fine aggregate by volume and sufficient water to make the
    mortar of such consistency that it can be handled easily and spread with a
    trowel. Mortar shall be mixed only in those quantities required for
    immediate use. Unless an approved mortar mixing machine is used, the fine
    aggregate and cement shall be mixed dry in a tight box until the mixture
    assumes a uniform color, after which, water shall be added as the mixing
    continues until the mortar attains the proper consistency. Mortar that is
    not used within 90 minutes after the water has been added shall be
    discarded. Retempering of mortar will not be permitted.
506.3 Construction Requirement
506.3.1 Selection and Placing
When the masonry is to be placed on a prepared foundation bed, the bed
    shall be firm and normal to, or in steps normal to, the face of the wall,
    and shall have been approved by the Engineer before any stone is placed.
Care shall be taken to prevent the bunching of small stone or stones of the
    same size. Large stones shall be used in the corners.
All stones shall be cleaned thoroughly and wetted immediately before being
    set, and the bed which is to receive them shall be cleaned and moistened
    before the mortar is spread. They shall be laid with their longest faces
    horizontal in full beds of mortar, and the joints shall be flushed with
    mortar.
The exposed faces of individual stones shall be parallel to the faces of
    the walls in which the stones are set.
The stones shall be so handled as not to jar displace the stones already
    set. Suitable equipment shall be provided for setting stones larger than
    those that can be handled by two men. The rolling or turning of stones on
    the walls will not be permitted. If a stone is loosened after the mortar
    has taken initial set, it shall be removed, the mortar cleaned off, and the
    stone relaid with fresh mortar.
506.3.2 Bed and Joints
Beds for face stones may vary from 20 mm to 50 mm in thickness. They shall
    not extend an unbroken line through more than 5 stones. Joints may vary
    from 20 mm to 50 mm in thickness. They shall not extend in an unbroken line
    through more than two stones. They may be at angles with the vertical from
    00 to 450. Face stone shall bond at least 150 mm
    longitudinally and 50 mm vertically. At no place shall corners of four
    stones be adjacent to each other.
Cross beds for vertical faced walls shall be level, and for battered walls
    may vary from level to normal to the batter line of the face of the wall.
506.3.3 Headers
Headers shall be distributed uniformly throughout the walls of the
    structures so as to form at least one-fifth of the exposed faces. They
    shall be of such lengths as to extend from the front face of the wall into
    the backing of at least 300 mm. When a wall is 450 mm or less in thickness,
    the headers shall extend entirely from front to back face.
506.3.4 Backing
Backing shall be built mostly of large stones as shown in the approved
    Plans or as directed by the Engineer. The individual stones composing the
    backing and hearting shall be well bonded with the stones in the face wall
    and with each other. All openings and interstices in the backing shall be
    filled completely with mortar or with spalls surrounded completely by
    mortar.
506.3.5 Pointing
Both bed and vertical joints shall be finished as shown on the Plans or as
    directed by the Engineer. The mortar in joints on top of surface of masonry
    shall be crowned slightly at the center of the masonry to provide drainage.
506.3.6 Coping
Copings, if called for, shall be finished as shown on the Plans. Where
    copings are not called for, the top of the wall shall be finished with
    stones wide enough to cover the top of the wall from 450 mm to 1000 mm in
    length, and of random heights, with a minimum height of 150 mm. Stone shall
    be laid in such a manner that the top course is an integral part of the
    wall. The tops of top course of stone shall be pitched to line, in both
    vertical and horizontal planes.
506.3.7 Weepholes
It shall conform to the requirements of Item 504, Riprap and Grouted Riprap
    under Subsection 504.3.4, Weepholes.
506.3.8 Cleaning Exposed Faces
Immediately after being laid, and while the mortar is fresh, all face
    stones shall be thoroughly cleaned of mortar stains and shall be kept clean
    until the work is completed.
506.3.9 Curing
In hot or dry weather, the masonry shall be satisfactory protected from the
    sun and shall be kept wet for a period of at least three days after
    completion.
506.4 Method of Measurement
The quantity to be paid for shall be the number of cubic meters of stone
    masonry complete in place and accepted. Projections extending beyond the
    faces of the walls shall not be included. In computing the quantity for
    payment, the dimensions used shall be those shown on the Plans or ordered
    in writing by the Engineer. No deductions shall be made for weepholes,
    drain pipes or other openings of less than one square meter in area.
506.5 Basis of Payment
The quantity of masonry, determined as provided in Section 506.4, Method of
    Measurement, shall be paid for at the contract unit price per cubic meter
    for Stonemasonry, which price and payment shall be full compensation for
    furnishing and placing all materials, including mortar for masonry, for all
    necessary excavations, and for all labor, equipment, tools and incidentals
    necessary to complete the Item.
Payment will be made under:
Pay Item Number
                 
 | 
            
Description
                 
 | 
            
Unit of Measurement
                 
 | 
        
506
                 
 | 
            
Stone Masonry
                 
 | 
            
Cubic Meter
                 
 | 
        