ITEM 507 – RUBBLE CONCRETE
507.1 Description
    
This item shall consist of the construction of rubble concrete in
    accordance with this specification and in conformity with the lines,
    grades, slopes and dimensions shown in the Plans or established by the
    Engineer.
507.2 Material Requirements
507.2.1 Stone
The stone shall be cleaned, hard, and durable and shall be subject to the
    Engineer’s approval. Adobe stone shall not be used unless otherwise
    specified. Stones to be used shall be more than 0.015 cubic meter in volume
    and not less than 75 percent of the total volume of rock embankment and
    shall consist of stones 0.03 cubic meter in volume as described in Item
    506.2. Stones obtained from excavation performed under this contract may be
    used.
507.2.2 Concrete Class “B”
Concrete shall be Class “B” in accordance with Item 405, Structural
    Concrete.
507.3 Construction Requirements
507.3.1 Preparation of Foundation Bed
The foundation bed shall be excavated to the lines and grades as shown in
    the plans as directed by the Engineer, and shall be thoroughly compacted in
    accordance with Item 104.3.3.
507.3.2 Falsework and Formwork Construction
Falsework/formwork shall be constructed so as to withstand the stresses
    imposed.
Formwork used shall be constructed with sufficient strength, rigidity and
    shape as to leave the finished works true to the dimensions shown on the
    Plans and with the surface finished as specified.
The inside surface of the forms shall be cleaned of all dirt, water and
    foreign materials. Forms shall be thoroughly coated with form oil prior to
    use. The form oil shall be commercial quality form oil or other approved
    coating which will permit the ready release of forms and will not discolor
    the concrete.
507.3.3 Placing
One layer of concrete Class “B” shall be placed at the prepared bed prior
    to placing of stones. Clearance between stones shall not be less than 2-1/2
    inches or the maximum size of concrete aggregate for Class “B”.
Concrete Class “B” shall be placed after each layer of stone and shall be
    thoroughly consolidated by means of a vibrato inserted in each layer of
    concrete. In no case shall the vibrator be operated longer than 10 seconds
    in any location.
After removal of forms, any cavities, voids and honeycomb spots shall be
    filled up with mortar composed of one part cement and two parts sand.
All debris and refuse resulting from work shall be removed and the site
    left in a neat and presentable condition.
507.3.4 Weepholes
It shall conform to the requirements of Item 504, Riprap and Grouted Riprap
    under Subsection 504.3.4, Weepholes.
507.4 Method of Measurement
The quantity to be paid for shall be the number of cubic meters of rubble
    concrete complete in place and accepted. In computing the quantity of
    payment the dimension used shall be those shown on the plans or ordered in
    writing by the Engineer. No reduction shall be made for weepholes.
507.5 Basis of Payment
The quantity of rubble concrete determined as provided in the preceding
    section 507.4, Method of Measurement, shall be paid for at the contract
    unit price per cubic meter for rubble concrete, which price and payment
    shall be full compensation for the preparation of the bed, furnishing,
    necessary excavations, falsework, and for all labor, equipment, tools and
    incidentals necessary to complete the Item.
Payment will be made under:
Pay Item Number
                 
 | 
            
Description
                 
 | 
            
Unit of Measurement
                 
 | 
        
507
                 
 | 
            
Rubble Concrete
                 
 | 
            
Cubic Meter
                 
 | 
        